Auction finance: what you're committing to before you raise your hand
Auction finance is short-term lending that moves at auction speed, and if you’re bidding for the first time you need it arranged before the day rather than after. There’s something else you need first, though. Two completely different things get sold under the word “auction” in this country, only one of them binds you the moment the hammer falls, and the difference rarely gets spelled out.
- First conversation is free
- No credit check to talk to us
Two minutes. No credit check, no obligation.
Guide price and what sort of state it’s in
And which auction house
We’ll ring you back today
Ashley on the two kinds of auction, and why the difference decides what you’re risking.
This is your first auction, or close to it. Maybe a doer-upper you’d live in, maybe something you’ve inherited. Right page, and start at the top.
You buy at auction regularly. We run a second site at bridgingfinancebroker.co.uk, same firm under its bridging name, with far more depth on auction, refurbishment and development lending than belongs here.
Two different things are called "auction"
Start here, because it decides what you’re risking. It doesn’t always get made clear, and the two get described with each other’s timescales constantly.
| Traditional auction | Modern method | |
|---|---|---|
| Also called | Unconditional | Conditional auction, auction by informal tender |
| When you’re committed | The moment the hammer falls. That’s exchange of contracts | You reserve it. You’re not contractually bound to buy in the same way |
| What you pay on the day | A deposit, normally 10% of the price | A reservation fee |
| Is it refundable | No, and that may not be the end of it | No, and it’s usually on top of the price rather than part of it |
| How long to complete | Normally 20 business days from the contract date | Longer, commonly around 28 days to exchange and 28 more to complete |
| Can you use an ordinary mortgage | Rarely. The timescale is brutal | Sometimes, if the property is mortgageable and your lender moves |
How to tell which one you’re in. Don’t go by the word “auction” and don’t assume the big names only run one kind. Look for “reservation fee” or “buyer’s fee” in the listing, which points to the modern method. Look at the completion period, because a longer one usually means conditional. And read the auction conduct conditions in the legal pack, which say it plainly. If you still can’t tell, ring the auction house and ask the question directly: am I exchanging contracts if I win?
The two methods carry opposite consequences, so a general description of “auction” tells you nothing about the lot in front of you. Ask about that lot.
Traditional: what you're actually signing up for
Win the bid and you’ve exchanged contracts. No survey clause, no finance clause, no cooling-off. The same commitment you’d normally make weeks into a purchase, made in about four seconds.
The deposit on the day. Under the Common Auction Conditions, which most auction houses use, it’s the greater of 10% of the price or whatever minimum the auction sets. You pay it there and then.
And here’s the bit that catches first-time buyers hardest: that money can’t come from your mortgage. Mortgage funds arrive at completion, weeks later. So if you’ve been saving a 10% deposit for a normal purchase, at auction you need that same cash available on the day, before any lending lands. Work out where it’s coming from before you register to bid.
The completion deadline. Everyone says 28 days. The Common Auction Conditions actually say 20 business days from the contract date, and a business day excludes weekends and bank holidays. Usually that lands near enough four weeks. Over Christmas or Easter it doesn’t, and individual auctions vary the period in their own conditions anyway. Read yours rather than trusting the round number.
If you can’t complete, it isn’t only the deposit
Losing the deposit is the part everyone knows about. It’s the start of the list.
Under the Common Auction Conditions, where a buyer fails to comply with a notice to complete the seller may terminate the contract, forfeit the deposit, resell the property and claim damages. Damages in practice means the shortfall if it sells for less next time, plus the costs of the failed sale and the second one, and interest for the period you were late.
So the worst case on a traditional lot isn’t losing ten per cent. It’s losing ten per cent and then receiving a bill. Rare, because most people complete, and the reason you arrange auction finance before you bid rather than hoping afterwards.
Deposit, completion date and the seller’s remedies are from the RICS Common Auction Conditions, which most UK auction houses adopt. Individual auctions amend them in the special conditions, so the pack for your lot is what governs your purchase.
Modern method: the reservation fee
Gentler in one way and more expensive in another, and it’s increasingly what ordinary residential lots are sold under.
You don’t exchange on the hammer. You pay a reservation fee and get an exclusivity period to get your finance and your legals done. If it all falls apart you lose the fee rather than facing the full traditional consequences, which is a genuine advantage and the reason the method exists.
Three things to understand before you bid:
- It’s normally on top of the price, not part of it. Pay a fee and the seller still gets the full hammer price. People assume it comes off. It generally doesn’t.
- It’s non-refundable, and it’s usually a percentage of the price with a minimum, whichever is greater. On a modest house the minimum often bites, so as a proportion it can be a lot more than the headline percentage suggests.
- It may count towards your stamp duty. Depending on what the fee is actually for and what the paperwork says, it can form part of the chargeable consideration, which would push your stamp duty up and could tip you over a threshold. The position isn’t settled, and you’ll see it stated both ways. Ask your conveyancer about your specific contract before you bid, rather than finding out at completion.
Add the fee, the stamp duty question and your legal costs together before deciding what you can bid. The number you can afford to pay the seller is lower than the number you can afford in total.
Why an ordinary mortgage often can't do it
Two separate reasons, and the first gets all the attention while the second is what usually sinks people.
Speed. A residential mortgage application typically runs to weeks, and a traditional auction gives you 20 business days from a standing start. Some lenders can do it if everything’s lined up beforehand. Most can’t, reliably, and “reliably” is the word that matters when the alternative is losing your deposit and getting sued.
The property itself. This is the one. Plenty of lots are at auction precisely because a mainstream lender won’t touch them, and no amount of speed fixes that. A mortgage valuer is asked whether the property is suitable security, and these are the usual answers that mean no:
- No kitchen or no bathroom. Most lenders need a property to be habitable, and a house you’d happily camp in while you fit a kitchen is often not mortgageable until the kitchen’s in.
- A short lease. Below a certain length, lenders stop lending, and the figure varies between them.
- Structural problems, subsidence history, or a survey that recommends further investigation.
- Non-standard construction, such as concrete prefabs, steel frames or timber frames of certain eras.
- Japanese knotweed, or cladding questions on a flat.
- No building regulations sign-off on work that’s already been done.
The sequence that works is a bridge to buy it, the work done to make it mortgageable, then a residential mortgage or a buy-to-let to repay the bridge. That second mortgage is the exit, and it needs to be realistic before you bid, not hoped for afterwards. If you’d be living there, that bridge is likely to be regulated, which brings you advice and the protections that go with it.
The legal pack, and what to have checked
The most-asked question in this whole subject and one of the worst served. Get a solicitor to read it before you bid. It costs a couple of hundred pounds and it’s the best money in the process.
What they’re looking for:
- The special conditions. The ones that shift the seller’s costs onto you, so you end up paying their legal fees, their search fees or the auctioneer’s costs on top of the price.
- Title problems, missing documents, or searches that haven’t been done and that you’ll be buying blind without.
- Tenants in place. You may be buying a property you can’t move into, and a tenancy you can’t easily end.
- Restrictive covenants that stop the thing you were planning to do with it.
- Leasehold arrears. Unpaid service charge and ground rent can follow the property, and a large bill can land on you after completion.
- The completion period, because the auction may have varied it from the standard.
One more thing: packs get added to right up to the auction. If your solicitor read it a fortnight ago, check for a later version on the morning. Addenda get published and they’re binding on you just the same.
Getting the money agreed before the day
Three steps, in this order, and start about three weeks out.
- Get an agreement in principle on the auction finance for the lot you’re interested in. Not a general “we could lend you something”, but a lender who’s seen the listing.
- Line up the valuation. A bridging lender still values the property, and that’s the step that takes the time. Some will start it before the auction if you’re serious about the lot.
- Agree the exit. Get a view on whether the mortgage that repays the bridge will actually be available once the work’s done.
And know your ceiling. If the valuation comes in under what you bid, the lender lends against their figure, not your price, and you find the difference in cash. At auction people get carried away in the room, so decide your maximum beforehand and have a number in your head you won’t go past. The shortfall is yours.
The words you'll hear, in plain English
An indication of where bidding might start. Not a valuation and not what it’ll sell for.
The confidential minimum the seller will accept. Below it, the lot doesn’t sell.
Traditional auction. The hammer is exchange of contracts and you’re committed.
Modern method. You reserve rather than exchange, and pay a fee for the privilege.
What you pay to secure a lot under the modern method. Non-refundable and normally on top of the price.
The documents on a lot: title, searches, leases, special conditions. Have it read before you bid.
The seller’s own terms for that lot, which override the standard ones and often move costs onto the buyer.
A late change to the pack or the catalogue. Binding, and easy to miss on the day.
What a seller serves when you’ve missed the deadline. The step before they start claiming damages.
A property a mainstream lender won’t lend on as it stands. Usually fixable, which is the whole idea.
Send us the lot and the auction date before you bid. We’ll tell you whether it’s a traditional or modern-method sale, whether a lender will touch the property, and what you’d need to have ready on the day.
Auction finance FAQs
Yes, there’s nothing stopping you, and people do it. Whether you should is a different question. You’re committing without the usual safety nets, and the things that protect an ordinary buyer, the survey, the finance clause, the chance to renegotiate, mostly aren’t there. If you’re buying a straightforward house to live in and you’ve no particular reason to be at an auction, the open market is usually the easier road. If the property’s the sort that only turns up at auction, go in prepared rather than hopeful.
Ask, in those words, before you bid. At a traditional auction the hammer is exchange of contracts and you’re committed. Under the modern method you’re reserving rather than exchanging, and you lose a fee instead. Clues: a “reservation fee” or “buyer’s fee” in the listing points to the modern method, as does a longer completion period. The auction conduct conditions in the legal pack say it outright. Don’t go by the auction house’s name, because some run both.
On a traditional lot, ideally yes, because once you’ve bid you own the problem. The hard part is that you might spend the money and then be outbid, and you don’t get it back. That’s the cost of doing it properly, and it’s a lot cheaper than buying something with subsidence. At minimum, view it with someone who knows buildings, and have the legal pack read by a solicitor, which is less expensive and catches a different set of problems.
About three weeks if you can. You want an agreement in principle from a lender who’s actually seen the lot, the valuation lined up, and a view on the mortgage that’ll eventually repay the bridge. The valuation is the part that eats time, and some lenders will start it before the auction if you’re serious. Leaving it to the week of is how people end up bidding on something they can’t fund.
No, and this catches more first-timers than anything else. Mortgage money arrives at completion, which is weeks after the auction, and the deposit is payable on the day you bid. So you need that cash available upfront, separately from whatever lending you’re arranging. If you’ve saved a deposit for a normal purchase you may well have it, but check the figure against 10% of what you’re actually planning to bid rather than the guide price.
Under the Common Auction Conditions it’s the greater of 10% of the price or whatever minimum that auction sets, payable on the day. Note it’s 10% of the price you bid, not of the guide price, and guide prices are often well below where things finish. Work out your maximum bid first, take 10% of that, and make sure it’s sitting somewhere you can actually pay it from on the day.
Usually not, and people assume otherwise. Under the modern method the fee is normally on top, so the seller still receives the full hammer price and you’ve paid the fee as well. It’s non-refundable, and it’s typically a percentage with a minimum, whichever is greater, so on a cheaper property the minimum can make it a much bigger proportion than the headline rate suggests. Factor it in before you decide what you can bid.
It might, and the honest answer is that the position isn’t settled. Depending on what the fee is really for and how the paperwork is drawn, it can form part of the chargeable consideration, which raises your stamp duty and could push you over a threshold. So ask your conveyancer about your actual contract before you bid, because this is a real number and it’s much easier to know beforehand.
Sometimes, on a modern-method lot where the property is in mortgageable condition and your lender is quick. On a traditional lot it’s a stretch, because you’ve got 20 business days and most residential applications don’t run that fast reliably. And often the property is the real obstacle rather than the speed. If it needs a kitchen or a bathroom putting in, most lenders won’t lend on it at all until that’s done, however long you give them.
Usually it’s no kitchen or no bathroom, because a lender needs somewhere that’s habitable now rather than habitable eventually. After that: a lease that’s too short, structural trouble or a history of subsidence, non-standard construction like concrete prefabs and certain steel and timber frames, Japanese knotweed, cladding questions if it’s a flat, or work that’s been done without building regulations sign-off. None of that’s necessarily permanent, which is rather the point of an auction. It does mean you’ll bridge to buy it, fix whatever’s wrong, then mortgage it properly once you have.
Possibly, and it changes your lending, so don’t leave it unsaid. If you’ll be living there the bridge is generally a regulated one, which means you’re getting advice and the FCA’s protections rather than a straight commercial deal. The practical side is whether the place is safe to be in while the work’s going on, and what your insurer makes of it, because plenty won’t cover a property that’s a building site. Sort it out before you bid, because it changes which lenders will even look at you.
Send us the lot before you bid
Catalogue link, lot number, what sort of state it’s in and what you’d do with it. We’ll tell you whether it’s financeable, what the exit looks like and where your ceiling should be. Far better to know now than in the room. No credit check to have the conversation.