EPC rules for landlords: where the standard is now, and where it's going

The minimum you can let at today is band E. The standard every tenancy has to reach is band C, and the date is 1 October 2030. Between those two facts sits a cost cap, eight exemptions, a register you have to use, and a set of regulations that have not been made yet. This is what has been decided, what hasn’t, and what a landlord can usefully do about it now rather than in 2029.

✓ FCA regulated advice
★★★★★ 4.8 from 40 reviews
🏆 Complex Buy to Let Broker 2026
What are you trying to do?

Two minutes. No credit check, no obligation.

The property

Type, age and current EPC band

What you're planning

Hold, improve, remortgage or sell

Your number

We’ll ring you back today

The minimum you can let at today, and has been since April 2020
The date every tenancy has to have reached band C
The cap on what a landlord has to spend getting there
The most a council can fine you today, per property
Podcast slot

Ashley on the properties that can’t get to band C, and what landlords are doing about them.

Where the rules stand today

Since 1 April 2020 you can’t let, or carry on letting, a property rated below band E unless you’ve registered a valid exemption. That applies to assured tenancies, regulated tenancies and domestic agricultural tenancies, in each case where the property is legally required to have an EPC at all. A property that isn’t let needs nothing done to it until it is.

The money side has a ceiling. The most a landlord is required to spend getting a property to band E is £3,500 including VAT, and anything you’ve spent on energy efficiency since 1 October 2017 counts towards it. If the property reaches E for less, you stop there. If it can’t reach E even after you’ve spent the cap, you make every improvement the cap will cover and then register an exemption.

One useful wrinkle: where third-party funding covers the whole cost of getting to E, the cap doesn’t apply at all. A grant that does the job in full doesn’t let you off the work.

The move to band C, and the date that actually matters

The government has confirmed band C as the new standard for the private rented sector, and the deadline is 1 October 2030 for all tenancies.

The consultation had proposed an earlier date of 2028 for new tenancies, with existing ones following later. That two-stage approach was dropped. There’s now one date, and it applies to everything.

There’s a transitional point worth knowing. A property with an EPC rated C or above issued before 1 October 2029 counts as compliant until that certificate expires or is replaced, even though the new standard is measured on different metrics. If you’re due an EPC anyway, when you get it matters.

What hasn’t happened yet is the law. The government intends to take new powers through an Act of Parliament first, and then lay regulations under them, with the aim of those regulations coming into force in 2027. Until that happens the 2030 date is policy rather than statute. It would be unwise to treat it as optional, and equally unwise to spend heavily on the strength of detail that could still move.

What band C will actually require

Not simply a letter on a certificate. The new standard is built in two parts, and the EPC itself is being re-metricated, so a property’s band under the new system won’t necessarily match its band under the old one.

The first part is a fabric performance standard, and it’s the primary one. Insulation, draught-proofing, glazing: the parts of a building that stop heat leaving. The second part is a choice between a smart readiness standard and a heating system standard, and the choice is the landlord’s.

That structure matters more than it sounds. A fabric-first requirement means you can’t reach the standard purely by swapping a boiler, which is the cheap route most people assume exists. It also means the work is the kind that takes planning, scaffolding and time rather than an afternoon.

The cost cap, and what counts towards it

The cap for reaching band C is £10,000 per property. The government’s own impact assessment puts average spend well below that, at around £5,400, which tells you the cap is there for the hard cases rather than the typical ones.

Money that comes from the Boiler Upgrade Scheme doesn’t count towards the cap. That’s deliberate: taking a grant shouldn’t use up your allowance and let you stop sooner.

If you reach the cap without reaching band C, there’s an exemption for exactly that, and it runs for ten years.

The exemptions, old and new

Exemptions let you carry on letting a property that doesn’t meet the standard. They aren’t automatic. You register them, and the register is public.

Today’s system runs on the PRS Exemptions Register. An exemption applies from the date you register it, not from the date you became eligible for it, so registering late leaves a gap you were letting through. Most exemptions last five years. The one for someone who has just become a landlord lasts six months. A third-party consent exemption based on a tenant refusing permission lasts until that tenancy ends or is assigned.

Under the new standard there will be eight. Three carry over largely unchanged: high cost, third-party consent, and the six-month grace period for a new landlord. One is tightened: the exemption for having made all relevant improvements now applies only where no further improvement is possible. Four are new or merged, and they’re the ones to read if you own anything unusual.

  • Cost cap. You’ve spent £10,000 and the property still isn’t at C. Ten years.
  • Property value adjustment. For properties valued below £100,000. Ten years.
  • Solid wall insulation. Its own exemption, reflecting how often solid walls are the thing that makes a property impossible to bring up cheaply.
  • Negative impacts. This merges what used to be the devaluation exemption and the wall insulation one. Ten years.

The penalties, and who hands them out

Enforcement sits with the local authority, and the penalties are per property and per breach.

BreachMaximum penalty
Letting a non-compliant property for less than three months£2,000, and publication of the details
Letting a non-compliant property for three months or more£4,000, and publication
Giving false or misleading information to the register£1,000, and publication
Failing to comply with a compliance notice£2,000, and publication
Total, per property£5,000

Publication is the part landlords underrate. The register is searchable by the public, and it shows penalties as well as exemptions.

Alongside the new standard the government has proposed a maximum civil penalty of £30,000, explicitly set above the £10,000 investment cap so that paying the fine is never the cheaper option. That tells you how the enforcement regime is meant to be read.

Why your lender has an interest in any of this

A property you aren’t allowed to let is a property with no rent coming in, and a buy-to-let mortgage is underwritten on rent. That’s the whole of the connection, and it’s enough.

In practice it shows up in three places. Valuation, because a surveyor pricing a property with a poor certificate is pricing in work somebody has to do. Criteria, because some lenders take a view on band at application. And product choice, because an increasing number of lenders price EPC-linked products differently from their standard range.

If you’re remortgaging a property that sits at E or F, the EPC is worth looking at before the application rather than after the valuation comes back. It’s also worth knowing that improvement work done between now and 2030 has to be paid for from somewhere, and the cheapest version of that money is usually arranged at the same time as a remortgage rather than separately afterwards.

What's worth doing now

Not panicking, and not waiting either. Four things are useful today and cost very little.

  • Find the current certificate and read the second page. Every EPC carries a recommendations report listing the measures that would lift the band and roughly what each costs. Most landlords have never opened it.
  • Work out which of your properties is the problem one. In a portfolio it’s rarely all of them. It’s usually the solid-walled one, the one with electric heating, or the flat with a communal system you don’t control.
  • Keep the receipts. Spend since October 2017 counts towards the band E cap, and evidence of spend will matter again under the new one.
  • Think about sequencing. Work done at the point a tenancy ends is far cheaper and less disruptive than work done around a sitting tenant, and 2030 is only so many void periods away.

[to confirm with Ashley: worth deciding whether we say anything here about arranging finance for improvement work specifically, or leave]

EPC questions landlords ask

Band E, and that’s been the position since April 2020. Below E you can’t let or continue letting unless you’ve registered an exemption. The standard moves to band C for all tenancies on 1 October 2030.

Yes. The consultation originally proposed an earlier date for new tenancies only, with existing ones following, and that split was dropped. There’s one date and it covers everything.

For now, and for a while. A certificate rated C or above issued before 1 October 2029 counts as compliant until it expires or is replaced. The new standard is measured on different metrics, so a property that scrapes C today may not score the same way once it’s reassessed.

Up to £3,500 including VAT to reach band E, counting anything spent on energy efficiency since October 2017. The proposed cap for reaching band C is £10,000 per property, with the government’s own estimate of average spend around £5,400.

You register an exemption. Under the current rules you have to make every improvement the £3,500 will cover first. Under the new standard there’s a cost cap exemption built in specifically for this, lasting ten years.

Through the PRS Exemptions Register, online. The thing to know is that an exemption applies from the date you register it rather than the date you qualified for it, so a delay in registering leaves a period where you were letting without cover.

Most last five years. The one for someone who has just become a landlord lasts six months. A consent exemption based on a tenant refusing permission lasts until that tenancy ends or is assigned. Under the new standard the cost cap, property value and negative impacts exemptions last ten years.

Probably not. The new standard is fabric-first: the primary requirement is about insulation, glazing and draught-proofing, with a secondary standard where you choose between smart readiness and the heating system. A heating swap alone isn’t designed to get you there.

Up to £5,000 per property in total today, made up of £2,000 for letting non-compliant under three months, £4,000 for three months or more, £1,000 for false information on the register and £2,000 for ignoring a compliance notice. Details can also be published on the public register. A maximum of £30,000 has been proposed alongside the new standard.

The band E requirement is. The band C requirement isn’t. The government intends to take powers through an Act of Parliament and then lay regulations, aiming for them to be in force in 2027. The direction is settled; some of the detail could still move.

Indirectly, and sometimes directly. A poor certificate can affect the valuation, some lenders take a view on band at application, and a growing number price EPC-linked products differently from their standard range. On a remortgage it’s worth looking at before you apply rather than after the valuation.

Usually, and the cheapest version is normally arranged alongside a remortgage rather than separately afterwards. Whether that’s the right answer depends on the property, the rent and how long you plan to hold it, which is a conversation rather than a web page.

Work out which properties are the problem ones

Send us the addresses and the current bands and we’ll tell you which ones are likely to need work, what that tends to cost for that type of property, and how it fits with whatever you’ve got coming up for renewal. If the answer is that you’re fine until 2029, we’ll say that.

Scroll to Top