Development finance calculator: what the scheme makes, and what you have to find

Land, build and what the finished scheme is worth. From those three this works out your margin, the senior facility a lender would size against the deal, and the equity you’d have to put in behind it. Then it does the part most appraisals leave out and shows you what the finance costs do to the profit.

✓ FCA regulated advice
★★★★★ 4.8 from 40 reviews
🏆 Complex Buy to Let Broker 2026
What are you trying to do?

Two minutes. No credit check, no obligation.

The site

What you’re buying and what you’d build

The numbers

Land, build and your GDV

Your number

We’ll ring you back today

Against cost and against GDV, and the lower one decides the facility
The profit with the interest and the fee taken off, not just before
Nothing here asks for your details to show you an answer
Credit checks. Using this touches nothing
Development finance calculator
Cost, margin, what a senior lender funds and what you have to find yourself. Every line says where the figure came from.
Gross development value, finished£
Land or site cost£
Build cost, with fees and contingency£
Everything else: planning, s106, selling£
Lender's cap on total cost%
Lender's cap on GDV%
Rate a month%
Programme lengthmths
Arrangement fee%
Average share of the facility drawn%
Margin on GDV
—
Profit before finance, divided by what the finished scheme is worth. The figure an underwriter reads first.
Margin on cost
—
The same profit, divided by what it cost you to get there.
Equity you have to bring
—
The total cost of the scheme, less whatever the senior facility covers. Before finance costs.
—
Total development cost
—
Senior facility
—
Profit before finance
—
Profit after finance
Guidance only. This is arithmetic, not an appraisal. Everyone's scheme is different, every lender reads one differently, and what gets funded depends on the site, the planning and your track record as much as the numbers, so treat the answer as a starting point and take advice before you rely on it.
The caps, the rate and the drawn percentage it opens with are starting points, not averages. Put your own figures in, and if you don't know them yet, that's the conversation to have before you offer on a site.
Podcast slot

Ashley on why the profit before finance is never the profit.

The profit before finance isn't the profit

Most appraisal calculators stop at cost, value and margin. That’s the easy half, and it flatters every scheme, because the interest and the arrangement fee come out of exactly the same pot as your profit.

This one shows both. Profit before finance, which is what the site is worth doing, and profit after finance, which is what you’d actually be left with.

What the appraisal is really telling you

Total development cost is the land, the build with its fees and contingency inside it, and everything else the scheme swallows: planning, any section 106 money, and the cost of selling at the end. Take that off the gross development value and you have the profit before finance.

That profit then gets measured two ways, and both matter. Margin on GDV is the profit as a share of what the finished scheme is worth, and it’s the figure an underwriter looks at first. Margin on cost is the same profit against what you spent, which is the one that tells you whether the effort was worth it.

A scheme can look healthy on one and thin on the other, which is usually a sign that the land is cheap and the build is heavy, or the other way round. Read both before you decide anything.

The facility is capped twice, and the lower cap wins

A senior facility gets sized against two limits at once: a percentage of your total cost, and a percentage of the GDV. Whichever produces the smaller number is the one you get, and the calculator applies both and then tells you which of the two is actually biting.

That matters the moment you try to close a gap. If the cost cap is binding, trimming the build lifts the facility. If the GDV cap is binding, trimming the build achieves nothing at all, because that limit has no interest in what you’re spending, and the only things that move it are a higher end value or a lender who caps differently. People lose weeks pushing the wrong lever.

Both caps are fields here rather than fixed numbers. They move with the lender, the site, the scheme and your track record, so put in whatever you’ve actually been quoted.

Interest on a development loan isn't interest on the whole loan

Development money is drawn in stages, against a monitoring surveyor signing off work as it happens. You take the land tranche at the start and the build money arrives in lumps as the scheme goes up, so for most of the programme you’re paying interest on a fraction of the facility rather than the lot.

That’s why there’s a field for the average share drawn. It’s the single assumption with the biggest effect on the finance cost, and most calculators either bury it or ignore it and charge interest on everything from day one. Change the percentage and watch the profit after finance move. If you don’t know yet, run it both ways and see whether the scheme survives the pessimistic version.

The money you need is more than the gap

The headline equity figure is the total cost less the facility, and it’s the number most appraisals print. It isn’t what leaves your account, because the arrangement fee and the rolled interest have to come from somewhere too, and on most deals they come out of the facility, which shrinks what’s left for the build.

So treat the equity line as the floor rather than the answer. The calculator shows you the finance cost alongside it, and the sum of the two is closer to what you need to have available before you start.

Where appraisals go wrong, and it's rarely the arithmetic

Two inputs do most of the damage. An optimistic GDV, which the lender’s valuer will test and reduce, and a build cost without enough contingency in it, which the first ground survey will test for you. Everything downstream is only as good as those two.

So put the contingency inside the build figure rather than hoping the margin absorbs it, and take your GDV from comparable sales rather than asking prices. If the scheme only works on the best version of both, it doesn’t work.

Development finance sits outside the regulated world

A loan secured on land is a regulated mortgage contract where the borrower is an individual or trustees and at least forty per cent of that land is used, or intended to be used, as a dwelling by the borrower or a close relative. A site you’re developing to sell doesn’t meet that test, so the lending is almost always unregulated.

That means it moves faster and the terms are more negotiable, and it also means the consumer protections that sit around a residential mortgage aren’t there. Read the facility agreement properly, particularly what happens if the programme runs long.

Development appraisal questions

Gross development value: what the finished scheme is worth when it’s built and sold, taken from comparable sales rather than from asking prices or hope. Everything else hangs off it, because the lender caps the facility against it and reads your margin from it, and its valuer will form an independent view of it before anything completes.

The build itself, professional fees, and a contingency, all in one figure. Keep the contingency inside the build cost rather than leaving it to the margin, because a margin that absorbs overruns isn’t a margin, it’s a buffer you’ve already spent. If you’ve got a builder’s quote, use it and add to it.

Margin on GDV, usually first, because it tells them how far values can fall before their security is at risk. Margin on cost is the one that tells you whether the scheme is worth your time. Each lender sets its own minimum rather than there being one industry number, which is why this calculator shows you the figure and leaves the judgment to the conversation.

Because they protect against different things. A cap on cost stops the lender funding more than the scheme is consuming, and a cap on GDV stops it lending against an optimistic end value. Both are applied and the smaller result is the facility, so when you want to lift the loan it’s worth knowing which one is actually in the way.

Monthly, on what you’ve drawn rather than on the whole facility, with the money released in stages as work is signed off. Interest is usually rolled up and settled when the scheme sells or refinances rather than paid monthly, so it comes out of the profit at the end.

It’s the average share of the facility outstanding across the programme. Nothing is drawn on day one except the land money, and the full facility is only outstanding at the very end, so charging interest on all of it for the whole term overstates the cost badly. Put in your own estimate, then try a higher one and see whether the scheme still works.

On these figures it’s the total cost less the facility, and that’s the floor rather than the answer, because the arrangement fee and the rolled interest have to be funded too. The calculator shows both so you can see the real number you need available before you commit to a site.

There are routes: mezzanine behind the senior debt, a joint venture partner taking a share of the profit, or restructuring the deal so less cash is needed up front. All of them cost something, usually in profit rather than in interest, so model the scheme with the equity you actually have before you fall in love with a site.

No, and that’s deliberate. It appraises the scheme, not the sale. How long the units take to sell, and whether you refinance onto a term loan while they do, changes the finance cost materially and depends on the market you’re selling into. Run a longer programme in the calculator to see roughly what a slow sale costs you.

For senior development finance, usually yes, or at least a clear route to it. Sites without consent are financed differently and more expensively, because the lender is taking planning risk alongside build risk. If you’re buying unconsented land, that’s a bridge or a specialist facility rather than a development loan, and the figures look different.

Quite a lot, more than on most lending. A first scheme usually means a lower cap, a higher rate or both, and the lender will look at who’s building it as much as what’s being built. A good contractor and a competent monitoring surveyor can do more for your terms than a few points of margin.

The first conversation costs nothing and there’s no credit check to have it, including the one where we tell you the site doesn’t work. Development and bridging fees work differently from residential mortgages, so your consultant confirms ours before you decide anything.

Send us the site and we'll tell you what it funds

Land, build, GDV and your timescale. We’ll tell you what a senior lender would size against it, which cap is in the way, what the finance would cost across the programme and where the rest of the money comes from. If the scheme doesn’t work, we’ll tell you that before you offer. No credit check and no obligation.