New build mortgages: incentives, offer windows and deposits

Buying a new build runs on a different clock to any other purchase. You commit early, the lender values something that may not exist yet, the developer’s incentives quietly change what you can borrow, and the house can take longer to finish than your mortgage offer lasts. Here’s each of those in the order it happens to you.

✓ FCA regulated advice
★★★★★ 4.8 from 40 reviews
🏆 Complex Buy to Let Broker 2026
What are you trying to do?

Two minutes. No credit check, no obligation.

Where are you up to?

Just looking, or already reserved a plot

Which development?

Builder and plot number if you have them

Best number for a callback

We’ll ring when it suits you

the usual window to exchange once you have reserved
of the price: incentives above this get deducted
how long a new build offer actually lasts
available on a new build house, despite the 20% myth
Podcast slot

Ashley on a new build offer that ran out of time, and what saved it.

What counts as a new build

Wider than you’d think. Lenders generally treat a property as new build if it’s being sold or occupied for the first time in its current state, or if it was built, converted or substantially renovated in the last two years. So a conversion counts, and so does a plot that sat unsold and was rented out by the developer for a while, because it’s still the first sale.

That matters because new build criteria are different from ordinary residential criteria, and finding out which set applies to you after you’ve reserved is a bad way to find out.

The words you’ll hear, in plain English

What you sign to take a plot off the market, with a fee attached. Both consumer codes require it to include a cooling-off period of at least 14 days.

Buying before the house is finished, sometimes before it’s started. You exchange on something that doesn’t exist yet.

The industry form your developer completes listing everything they’re giving you. It goes to the valuer and to the lender’s solicitor, and it’s the document that decides whether your loan gets reduced.

The backstop completion date in your contract. If the build runs past it you generally get the right to walk away.

What the developer serves when the house is ready. It usually gives you a matter of days to complete, not weeks.

Ten years of cover on the building itself, from one of a list of providers each lender maintains separately.

An alternative to a warranty on small schemes. Weaker than it sounds, and explained below.

The mechanism by which owners of freehold houses on a private estate are charged for its upkeep. Lenders take an interest in it for a specific legal reason.

The list of things not finished properly. A contractual matter with the developer, not a mortgage one.

Step one: you reserve, and the clock starts

You pay a reservation fee, the plot comes off the market, and you’re usually given around 28 days to exchange contracts. That isn’t a rule anywhere, it’s a developer convention, but it’s near universal and it’s short. Your mortgage application starts from behind.

Two things worth knowing before you sign anything.

  • You get a cooling-off period of at least 14 days. Both of the consumer codes that cover new build require it, with the reservation fee refunded, and you can cancel for any reason. Nobody at the sales office is likely to lead with this.
  • High-pressure selling is against both codes. Developers aren’t allowed to tell you other buyers are circling if they aren’t, or that the price is going up if it isn’t, and they aren’t supposed to offer incentives that require an immediate decision. If it feels like a car showroom, that’s worth noticing.

After the cooling-off period, missing the exchange deadline generally means the plot goes back on the market and you don’t get all of your fee back. So the practical answer is to have a lender lined up before you reserve, not after.

Ask which code your developer is signed up to

There are two, they’re both live, and neither has replaced the other. One brings the New Homes Ombudsman, which can award up to £75,000. The other brings a different dispute scheme with a lower ceiling. Which one you get depends entirely on which body your developer registered with.

It’s a one-line question to ask at the sales office, and almost nobody asks it.

Step two: the valuation, and the bit that catches everyone

Here’s the thing almost no website will tell you. Your developer has to complete an industry document called the Disclosure of Incentives Form, listing everything they’re giving you: the deposit contribution, the stamp duty they’re paying, the legal fees, the carpets, the upgraded kitchen, all of it. That form goes to the valuer at the site visit, and to your lender’s solicitor no later than seven working days before exchange.

You’ll struggle to find that form mentioned anywhere a buyer would look. It’s the document that decides whether your loan gets cut, and almost nobody buying a new build knows it exists.

How the deduction actually works

Most lenders set a threshold, commonly 5% of the purchase price, and treat anything above it as reducing what the property is really worth to them. What they differ on is what they deduct it from, and this is where it gets untidy.

What the lender doesWhat it means for you
Deducts the excess from the purchase priceThe most common. Your loan is calculated on a lower number than you’re paying.
Deducts it from the valuation insteadSame effect, different arithmetic, and it interacts differently with a down-valuation.
Doesn’t deduct, but cuts your maximum loan to valueA tiered approach. Modest incentives leave you alone, bigger ones drop the ceiling you can borrow to.
Bans cash incentives above a certain loan to value entirelyAt the higher end, some lenders won’t accept builder cash or deposit contributions at all.
Requires you to fund a set share from your own moneyRegardless of what the developer contributes, some lenders want a minimum from you.

What that looks like in pounds

Take a £300,000 house with a £20,000 deposit contribution from the developer. That’s 6.67% of the price, so with a 5% threshold, £5,000 is over the line.

A lender deducting from the purchase price now lends against £295,000 rather than £300,000. At 90% that’s £265,500 instead of £270,000. Which means the £20,000 gift has cost you £4,500 of borrowing, and you need that much more of your own money than you’d planned.

None of that is a scandal. It’s just arithmetic nobody shows you before you accept the incentive.

Which incentives count is broadly consistent. Financial ones are caught: deposit contributions, cashback, stamp duty paid, legal or valuation fees paid, mortgage subsidies, and part exchange where the developer pays above independently assessed market value. Fixtures and fittings usually aren’t: carpets, flooring, white goods, kitchen upgrades, landscaping. But every one of them still has to be disclosed on the form, whether it counts against the cap or not.

And if something gets agreed after the form has gone in, a late upgrade thrown in to keep the deal alive, it has to be re-disclosed. That’s the one that causes trouble at the last minute.

Down-valuation

Lenders lend against the lower of the purchase price or the valuation, always. On a new build the valuer is often working from plans and a specification rather than a finished house, with no directly comparable sale on the same street.

Be careful with what you read about this. There is no published UK data on how often new builds are down-valued, from any lender, from the surveyors’ body or from the regulator. Every percentage you’ll see quoted is somebody’s marketing. What is true is the mechanism, and that it stacks with the incentive deduction above: the incentive comes off first, and then the loan to value is applied to what’s left.

The incentive that costs you money

A deposit contribution from the developer is not free. Most lenders set a threshold, commonly 5% of the price, and treat anything above it as reducing what the property is really worth. On a £300,000 house a £20,000 contribution is 6.67%, so £5,000 goes over the line and the lender values the deal at £295,000. At 90% that is £265,500 instead of £270,000. The gift has cost you £4,500 of borrowing.

Step three: the offer, and how long it really lasts

New build offers run longer than ordinary ones, because everyone knows the build’s going to take a while. Published positions go from around six months to nine months as standard, and some lenders will extend to about twelve. A few of the big ones have lengthened theirs recently, which is why comparison tables you find online date quickly.

Three things worth knowing before you rely on the date.

  • Your offer can die before the date printed on it. At least one lender says expiry is the earliest of the offer end date, the product completion date, or the valuation expiry date. Whichever of those lands first is the one that’s ended it, and it won’t be the date you’ve written in your diary.
  • At least one lender starts the clock at your application, not your offer. So if underwriting’s taken a month, that’s a month you’ve lost off the far end and you’ll never see it back.
  • Valuations expire on their own clock. With some lenders a valuation’s good for a year, and after that you’ll need a new one and you’ll pay for it again, even if the offer itself is still running.

Match the long stop date to your offer

Your contract will have an anticipated completion date and a long stop date, the backstop beyond which you can walk away. The long stop is frequently set six months after the anticipated date, which can easily be past the end of your mortgage offer.

It’s negotiable, and it’s worth asking your solicitor to try to bring it inside your offer window before you exchange. Very few buyers know to ask.

The offer can expire before the house is finished

New build offers run longer than ordinary ones because everyone knows the build will take a while, but published positions still range from about six months to nine as standard, with some lenders stretching to twelve. If the development slips, and developments do slip, the offer is the thing that runs out. It is the single most common reason a new build purchase has to start again.

Step four: what happens if it expires anyway

You reapply. That sounds administrative and it isn’t, because you’re reassessed against the criteria and the rates that exist on that day rather than the ones you were offered. A credit search, fresh income evidence, usually a fresh valuation, and a new decision.

If anything about your circumstances has changed in the meantime, and over a long build it often has, that’s when it surfaces. And if you’ve already exchanged, you’re contractually committed to buy a house you may no longer have funding for, which is the genuinely frightening version.

The way to avoid all of it is unglamorous: tell us the expected completion date at the start so the offer is chosen around it, keep us posted when the developer’s date moves, and start the extension conversation early rather than in the last fortnight. It’s the same lesson as a collapsing chain on our moving home page, and it’s the reason new build cases need managing rather than just placing.

How much deposit you actually need

Less than the figure that usually gets quoted.

95% of the property value on a new build house is what several large lenders now publish, with no scheme attached to it. Flats are usually capped lower, commonly around 85%, and that gap’s real, though at least two lenders don’t apply it at all and cap the loan size instead. If someone’s telling you to expect to put down 20% or 25% on a new build, they’re working from information that’s years out of date.

Where you do end up needing a bigger deposit is when the incentive deduction and the loan to value ceiling stack up on each other, and that’s the arithmetic above rather than a rule about new builds.

What about the schemes?

This is the most out-of-date part of most new build pages, because schemes come and go and articles don’t get updated.

  • Help to Buy is gone. The equity loan ended in March 2023 and nothing replaced it. It’s still mentioned in plenty of places that haven’t been updated.
  • Deposit Unlock has closed to new completions. It was the builder-funded route to 95% lending, and its own trade body confirms it closed in April 2026. Existing offers are being honoured.
  • The Mortgage Guarantee Scheme is permanent and sits behind 95% lending generally, though whether a particular lender applies it to new builds is up to them.
  • Developer schemes come and go, including rate-reduction arrangements where the builder pays the lender to cut your interest for a period. Those are worth looking at carefully, because you’re still paying full price for the house.
You almost certainly need less deposit than you have been told

Several large lenders now publish 95% on a new build house with no scheme attached. Flats are usually capped lower, commonly around 85%, though at least two lenders do not apply that gap at all. Anyone still telling you to expect to put down 20% or 25% is working from information that is years out of date.

Warranties, and the one that isn't a warranty

Your lender will want ten years of structural cover from a provider on its own list, and every lender keeps a different list. Most of the well-known names appear on most lists, but not all of them, and a provider your developer uses isn’t automatically one your lender accepts.

Two things that catch people out.

  • The insurer behind the warranty can matter more than the brand on it. Lenders publish carve-outs naming which underwriters they’ll accept behind which providers, particularly where a provider has stopped trading. Two policies with the same logo can get different answers.
  • Retrospective warranties are refused everywhere. A warranty has to come from inspections during construction. One arranged afterwards is not accepted by anyone we’ve seen.

A professional consultant’s certificate is not a ten year warranty

On smaller developments you may be offered one of these instead. It’s a certificate from a qualified professional who inspected the build, and it’s a perfectly legitimate route, but it isn’t the same product.

The liability under it runs for six years, not ten. Fewer lenders accept it, and several restrict it to schemes of around ten units or fewer. And when you come to sell, your buyer will have a narrower choice of lender than they would with a full warranty. Worth knowing before you buy, not after.

Leasehold, ground rent and estate charges

If you’re buying a new build flat, the ground rent on your lease should be a peppercorn, meaning nothing payable. That’s been the law on most new leases since June 2022, with fines for charging it. So a monetary ground rent quoted on a brand new lease isn’t something to negotiate, it’s a red flag to raise with your solicitor.

The doubling ground rent problem you may have read about is a legacy issue affecting leases granted years ago. It shouldn’t arise on a new lease today.

Freehold houses have their own version, and it’s less well known. On many new estates the roads, drainage, lighting and open spaces aren’t adopted by the council, so owners pay a private management company through what’s called an estate rentcharge. Lenders care about this for a specific reason: the enforcement powers attached to a rentcharge under century-old legislation can rank ahead of the lender’s own security. Which is why conveyancers routinely need a deed of variation, a waiver or indemnity insurance before completion, and why these purchases stall.

Ask what the annual estate charge is, what it covers, and whether it’s capped, before you reserve rather than after.

Snagging

Worth being clear about what it is and isn’t. Snags are a contractual matter between you and the developer, not a mortgage matter. Lenders don’t generally hold money back for unfinished work, and your mortgage completes on the legal title rather than on the quality of the finish.

What does protect you is the code your developer signed up to. Both of them require the home to be complete before legal completion, require a schedule of any outstanding work to be given to you beforehand, and give you the right to have someone inspect the property before you complete. Use that right. It’s free to ask for and most buyers don’t.

What we do about all this

New build cases need managing rather than placing, and the difference shows up months later. In practice that means choosing a lender whose offer window fits the developer’s timetable rather than whichever rate looked best on the day, reading the incentive position before it reaches a valuer, checking the warranty provider against the lender’s list rather than assuming, and staying on the developer’s completion date as it moves.

We’re a credit broker and not a lender. You get twenty minutes on the phone first, with no credit check at that stage. If you’ve already reserved, bring the reservation form and whatever the developer has offered you, and we’ll tell you what it does to your borrowing before it becomes a problem.

The incentive disclosure requirements described here come from the industry form published by UK Finance. Warranty and consultant’s certificate requirements from the same source. Lender criteria vary and change without notice, so we check the specific lender rather than relying on a comparison table.

New build mortgage FAQs

On a house, 95% of the property value is published by several large lenders with no scheme attached, so a 5% deposit is genuinely possible. Flats are usually capped lower, commonly around 85%, though a couple of lenders don’t apply that differential and cap the loan size instead. If you’ve been told to expect 20% or 25%, that’s several years out of date. What can push your deposit up is the incentive deduction rather than any rule about new builds.

Lenders take the view that flats are more exposed if prices fall, particularly in a development where a lot of similar units come to market at once, so most cap them around ten percentage points lower than houses. It’s a real and common differential, but it isn’t universal: at least two lenders apply the same maximum to both and manage the risk by capping how much they’ll lend on a flat instead. So it’s worth checking rather than accepting the first answer.

Not harder exactly, but there are more ways for it to go wrong, and they’re mostly about timing and paperwork rather than about you. The criteria are a separate set from ordinary residential, the valuation may happen before the house exists, the incentives have to be declared and can reduce your loan, and the offer has to outlast the build. None of that is difficult if it’s handled at the start. All of it is difficult if it surfaces at the end.

Broader than most people assume. Lenders generally count anything being sold or occupied for the first time in its current state, or built, converted or substantially renovated within the last two years. So a barn conversion counts, a flat above a shop that’s been redeveloped counts, and so does a plot the developer rented out for a year before selling it, because it’s still the first sale. It matters because it puts you under a different set of criteria.

Fewer than most articles suggest. Help to Buy ended in March 2023 and nothing’s replaced the equity loan. Deposit Unlock, which was the builder-funded route to 95% lending, closed to new completions in April 2026. What’s left is the permanent Mortgage Guarantee Scheme that sits behind 95% lending generally, whether your lender chooses to apply it to new build, and whatever the developer’s running at the time. If a page is still promoting Help to Buy, treat everything else on it with suspicion.

These are arrangements where the builder pays a sum to the lender to reduce your interest rate for a couple of years rather than giving you money off the house. They can genuinely help with early affordability. What to hold on to is that you’re still paying the full asking price for the property, the benefit stops when the period ends, and it’s the developer’s money doing the work. Compare it against simply negotiating the price down by a similar amount, which is the alternative nobody offers you.

Frequently, yes, and this is the single most expensive thing buyers don’t know. Your developer has to complete an industry disclosure form listing everything they’re giving you, and it goes to the valuer and to your lender’s solicitor. Most lenders set a threshold, commonly 5% of the price, and treat anything above it as reducing what the property is worth to them. So a large deposit contribution can quietly cut what you can borrow, and you make up the difference.

Financial ones are generally caught: deposit contributions, cashback, stamp duty paid for you, legal and valuation fees paid, mortgage subsidies, and part exchange where the developer’s paying more than an independent valuation says your old home’s worth. Fixtures and fittings generally aren’t: carpets, flooring, white goods, kitchen upgrades, landscaping. Everything has to be disclosed either way though, and anything agreed after the form’s gone in has to be re-disclosed, which is what causes trouble at the last minute.

An industry form your developer completes, listing every incentive they’re offering you, financial and otherwise. It goes to the valuer at the site visit and to your lender’s conveyancer no later than seven working days before exchange. It’s the document that determines whether your loan gets reduced, and you’ll rarely see it mentioned anywhere a buyer would look. Ask your developer for a copy of what they’ve submitted.

Sometimes, partly, and it depends heavily on the lender. Some accept builder contributions towards the deposit within their threshold. Some require you to put in a minimum share from your own money regardless of what the developer gives you. And some won’t accept builder cash at all once you’re borrowing above a certain proportion of the value. It’s one of the first things to establish, because a plan built on the developer funding your whole deposit can fall apart at the lender selection stage.

Lenders always lend against the lower of the price or the valuation, so a shortfall either comes out of your pocket, gets renegotiated with the developer, or the case moves to a lender who’ll use a different valuer. On a new build the valuer’s often working from plans with no comparable sale nearby, which makes it likelier than on a second-hand house. Be wary of any site quoting a percentage for how often it happens, because there isn’t any published data on it.

Currently around six to nine months as standard, with some lenders extending to about twelve, and several have lengthened theirs recently. Don’t rely on the comparison tables you’ll find online, because most are years out of date. Three things worth knowing: your offer can expire earlier than its stated date if the product or the valuation expires first, at least one lender runs the clock from your application rather than your offer, and valuations expire on their own timetable.

You reapply, and that means being reassessed against whatever the criteria and the rates are on that day rather than the ones you were given. Fresh credit search, fresh income evidence, usually a fresh valuation. If anything has changed in your circumstances during the build, that’s when it shows up. And if you’ve already exchanged you’re contractually committed to a purchase you may not have funding for, which is why the completion date and the offer window need matching at the start.

Often, and how easily depends entirely on the lender. Some grant an extension on request from your broker without needing you to sign anything. Others re-score you, run a new credit search and require a refreshed valuation before agreeing. A few don’t extend at all on their longer new build offers, on the basis that the offer is already long. The common thread is that asking early is straightforward and asking late is not, so tell us as soon as the developer’s date moves.

Usually around 28 days. That’s a developer convention rather than a rule anywhere, but it’s near universal and it’s tight, because your mortgage application effectively starts from behind. What is a rule is that both consumer codes require a cooling-off period of at least 14 days in your reservation agreement, with the fee refunded and no reason needed. Beyond that window, missing the deadline generally means losing the plot and some of the fee.

It’s the backstop completion date in your contract, beyond which you generally get the right to walk away. It’s frequently set around six months after the anticipated completion date, which can put it well past the end of your mortgage offer. It’s negotiable, and asking your solicitor to try to bring it inside your offer window before you exchange is one of the more useful things you can do. Very few buyers know to ask.

On completion, same as any purchase, which on an off-plan buy can be a long while after you’ve exchanged and handed over your deposit. Nothing’s payable while the house is being built. What is happening in the meantime is that your deposit’s committed and at risk if the developer goes under, which is what the warranty’s deposit protection is there for.

Your lender will want ten years of structural cover from a provider on its own list, and every lender’s list is different. Most well-known providers appear on most lists, but not all, so the one your developer uses isn’t automatically one your lender takes. Two traps: the insurer sitting behind the warranty can matter as much as the brand on it, particularly where a provider has stopped trading, and a warranty arranged retrospectively is refused everywhere.

No, and it’s worth knowing why before you buy rather than when you sell. It’s a certificate from a qualified professional who monitored the build, and it’s a legitimate route on small developments, but the liability under it runs six years rather than ten. Fewer lenders accept it and several restrict it to schemes of around ten units. Your eventual buyer will have a narrower choice of lender than they would with a full warranty, which affects what your home is worth to them.

On a new lease it should be a peppercorn, meaning nothing payable. That’s been the law on most new leases since June 2022, with fines for charging it. So a monetary ground rent quoted on a brand new lease isn’t a negotiating point, it’s something to raise with your solicitor straight away. The doubling ground rent scandal you may have read about affects leases granted years ago, and shouldn’t arise on anything being sold new today.

On many new estates the roads, lighting, drainage and green spaces aren’t adopted by the council, so owners pay a private company to maintain them through an estate rentcharge. Lenders care because the enforcement powers attached to a rentcharge under old legislation can rank ahead of their own security, which is why conveyancers often need a deed of variation, a waiver or indemnity insurance before completion. Ask what the annual charge is, what it covers and whether it’s capped, before you reserve.

Not usually. Snags are between you and the developer, and lenders don’t generally hold money back for unfinished work, because your mortgage completes on the legal title rather than the quality of the finish. What protects you is the consumer code your developer signed up to: both require the home to be complete before legal completion, require a schedule of outstanding work beforehand, and give you the right to have someone inspect before you complete. That last one is free to ask for and most people don’t.

Getting the offer is much like any other purchase. What’s different about new build is everything after it, because the gap between offer and completion’s measured in months rather than weeks, and that gap’s where all the problems live. Ask on the first call and you’ll get a realistic range for your own case, rather than an average that fits nobody.

We’re a credit broker and not a lender. Your consultant confirms the fee before you choose to proceed, and we estimate it to be £495. The first conversation costs nothing.

Talk to us before you reserve

Twenty minutes and you’ll know what the developer’s incentives do to your borrowing, what deposit you actually need, and which lenders’ offers will outlast the build. No credit check to have the conversation, and no obligation after it.

Scroll to Top